Calhoun’s Can(n)ons The Bay New, Morro Bay, CA for April 12, 06 (25)


Tribune Out-Onions The Onion!


Oh, God Love em! The Tribune has finally and spectacularly out-Onioned The Onion (http://www.theonion.com/), that deviously delicious satirical “newspaper” that regularly makes up hilarious headlines and phony news stories.


Most folks learned years ago to read the Tribune’s Los Osos stories with a cup of coffee in one hand and a pound of salt in the other. In their defense, all newspapers have a tough time reporting on wars. The chaos of battle, the fog of conflict, the fast changing skirmishes over disputed ground, the rotation of reporters so that institutional memory gets lost and whoever gets tossed into the Los Osos Sewer Wars’ free-fire zone ends up with one overriding wish: Scribble something, anything, then get the hell out of the place alive.


The result is that the reader can end up with that amazing Onionish March 28th headline: “Plan calls for new tanks in Los Osos; An engineering firm says bout 5,000 septic tanks labeled as faulty need to be replaced – at their owners’ expense – with pressurized models.”


The lead paragraph continued, “About 5,000 Los Osos homes and business may have to buy new septic tanks under a plan advanced by a small engineering firm the services district will hire next week.” Puzzlement surely would have turned to consternation or anger: “A plan has been picked and is being advanced? Hey, I thought the voters were supposed to select the wastewater plan!”


Well, not to worry, there was indeed a problem with the story.


The CSD had voted to enter negotiations with Ripley Pacific Co. to determine the scope of work to be done in order to update the wastewater project report – the “scope of work” being a “compare, contrast and price out” various alternative systems which can then be presented to the Board and then the voters. In short, when the story ran, the negotiations to determine the scope of work hadn’t even been finished.




But there it was, the gape-mouth question: Plan? What plan? Was the Tribune calling the race even before the horse could get out of the stall? Not quite. Turns out the “Plan” presented on the front pages as news, was a three-year-old Ripley Pacific alternative step/steg proposal for Los Osos, a plan similar to what Ripley Pacific is now building in the northern California city of Stevinson. But the Tribune failed to identify it as such, even in their buried-on-B-2 “Corrections” section.


In addition to specious headlines, a more serious problem appeared in the text that repeatedly appears in so many stories about the Sewer Wars: “He said - She said” claims that are printed without making even the slightest effort to determine whether the claims are true or arrant nonsense.


For example, the March 28th story reports that “. . . 5,000 septic tanks labeled as faulty by [Regional Water Quality Control Board] regulators . . .” Five thousand “faulty” tanks? Really? There are about 5,000 homes in the prohibition zone. As anyone with a septic tank can tell you, if you have a “faulty” septic tank, you call a septic pumping company really, really quick.


Since the Tribune printed that claim without attempting to verify its truthfulness, I asked CSD Board Member, Julie Tacker: Has a septic tank inspection of the prohibition zone ever been done to determine how many tanks are “faulty”? No, Never. I called Al’s Septics: Have you gotten calls from 5,000 people complaining about “faulty” tanks? Laughter.


Three-year-old “plans,” Five thousand” faulty tanks?” That’s how unchecked, arrant nonsense can turn into “fact,” how perception becomes “reality.” And when the arrant nonsense is coming from a regulatory Regional Board that then uses this false information to damage a whole community, it’s easy to see the role our county’s newspaper of record plays in this game, not as a watchdog or factual corrective, but as a megaphone and nonsense magnifier.


Perception IS reality. The Sewer Wars, like all wars, are no joke and require serious, accurate reporting. When that goes missing, the community is badly served, indeed. And you wonder why the outside world has a totally false picture of Los Osos?


With The Onion, you know in advance it’s a joke. If the Tribune is now trying to out-Onion The Onion, then in addition to Caveat lector, when reading the Tribune Los Ososians need to add two more words: Bwa-hahahah.

Saturday, April 08, 2006

Push Pull Polling, Anyone? For a gander at how THAT little game works, trot over to www.sewerwatch.blogspot.com for Ron Crawford's discussion of "surveys," political campaign laws," push-pull polling and the old Bait & Switcharoo as it pertains to the good old question, "Just how DID we end up in this Sewervilel Train Wreck, anyway?" The past is prologue, as they say.

Friday, April 07, 2006

Toot, Toot, Chuga-Chuga. Elvis has left the building.

At the April 6th Los Osos CSD meeting, the Board voted to give a contract to Ripley Pacific Company to prepare the Wastewater Project Update report. The contract amount is a not-to-exceed $513,400 and will take approximately 17 weeks to complete. According to the Agenda, “The fee is allocated by task, which allows the Board to assess the relative cost of key activities and prioritizes funding accordingly. . . . site selection activities will be completed within 5 weeks of the Notice to proceed . . . environmental review [will begin] early in the process. . . . [review of on-site technologies] will be performed by Ensitu Engineering as part of a District-wide Septic System management Program.”

In addition, the report will focus on “an integrated approach to effluent disposal and treatment with the goal of maximizing the sustainability of the community’s water supply. The goal of achieving 100 percent reuse of the effluent will be pursued to the maximum extent practicable and economically feasible." . . .”an analysis and comparison of the configuration, feasibility, and cost of various types, systems and methods of wastewater collection including . . . Gravity collection and pumping . . . utilizing the 100% design drawings and cost estimates prepared by MWH [the Tri W project] . . . Septic Tank Effluent Pump (STEP) and Septic Tank Effluent Gravity (STEG) collections systems . . . “

Further, “The life cycle cost analysis will include capital, operation, maintenance and replacement costs through the life expectancy of the system . . . Project costs shall address items that were previously deferred [in the Tri W plan] including sludge management processes. “

In addition, “The Ripley team will work closely with the district’s claims experts and financial consultants to prepare a comprehensive project cost analysis that includes the budget for the selected project, sunk project costs, budgets for claim resolution, land purchases or sales, and a budget for potential litigation.” And, interestingly, “The cost estimates prepared in Task 9 will be subjected to independent review by a construction firm with the relevant background and experience, under a contract direct with the CSD or alternatively by subcontract to Ripley Pacific.”

And, in Task 11, an interesting addition: the Phased approach, to see if there would be a benefit in constructing any wastewater project in stages, i.e. identifying the most seriously impacted areas and getting them on line first, followed by less critical areas.

Furthermore, there were some Board comments that I found most interesting: If the Tri W project were brought before the State Water Board and the Regional Water Quality control Board today, it wouldn’t meet the new requirements regarding sustainability and water reuse. Irony? Indeed. Since the new rules are now in place, whatever results from the project update and new project will meet those new standards. More irony.

The whole agenda item will hopefully be posted on the CSD’s website so anyone can read it in full. There was discussion about funding, and it sounded like the CSD will be rattling the various CSD’s coin jars (various applicable accounts) to get some from this fund, some from that and look into borrowing the rest, part of which would be put into an escrow account, so should something ”untoward happen,” Ripley Pacific would be paid for work done to that point.

So, there it is. Toot, toot, chugga-chugga, the Project Update train has left the station. What the “boxcars” will look like when it pulls into view again remains to be seen. Glimpses of the shape of things will be presented to the public as the various “tasks” are completed. Whatever is finalized will meet all the new state requirements and standards, including, if a SRF loan is in the mix, the requirement for a Prop 218-type assessment vote. Plus, happily, the project’s price tag won’t play hide-the-salami with “deferred” costs, as the Tri W project did, so the $64,000 Question I’m sure the whole community is just waiting to get a gander at will be the long-term, no-deferred costs, all-inclusive, O,M & R, final, bottom-line, out of pocket price tag.

So, stay tuned.

Thursday, April 06, 2006

Quick, Get Me Rewrite!


I don’t know how it’s possible to misquote from a letter, but that’s what happened in the Tribune’s April 4th story headlined, “Sewer costs could shift to county taxpayers.” In that story, it was reported that in a letter to LAFCO from Assistant County Administrator Gail Wilcox, that “Wilcox told [told? or wrote?] the Local Agency Formation Commission that county staff believes the district was adequately serving Los Osos residents and that there would be no advantage to the county taking over its responsibilities.”

In a “Correction” the next day it stated that the “letter to the Local Agency Formation Commission . . . did not say that the county staff believes the district is adequately serving Los Osos residents. Instead, she more narrowly addressed the question of whether ‘there is something about the structure or legal authority of the CSD that is inadequate to address the needs of the residents.’ She concluded that, in the opinion of county staff, there is not a structural or legal inadequacy.”

Ah, and there it was, the most interesting question that LAFCO and the community have to answer: Is the Dissolution Group claiming that the structure and legal authority of the CSD is so flawed that it must be dissolved? Or, is the structure and legal authority functioning just fine, but it’s the POLITCAL results that the Dissolution Group doesn’t like. If that’s the case, does LAFCO have the legal power to dissolve a properly functioning structure just because certain folks don’t like the POLITICAL results?

And that’s what’s been so weird about the Dissolution Group from day one – Instead of using the structure to change the political results – public comment and input, serving on advisory committees to effect change, starting a new recall petition, or starting some initiatives, or even fielding candidates for November’s board election -- the Dissoution Group moved immediately after the recall votes were certified to remove the entire structure altogether.

Which is sort of like people saying after the re-election of President Bush, “George is a really, really bad political result, so let’s dissolve the U.S. Government and petition Queen Elizabeth to take us back into the Commonwealth.”

In effect, that’s what LAFCO must decide: If the structure is fine, will LAFCO declare that The People must have to work within that structure FIRST to effect the POLITICAL changes they want to see? Or, can LAFCO step in and remove a perfectly good working structure in order to effect a POLITICAL change, even though the various mechanisms for political change were never even tried in the first place?

We may have an answer in June. Stay Tuned.

Sunday, April 02, 2006

More Q's but few A's over at Ron Crawford's site, www.sewerwatch.blogspot.com as Ron asks more snarky questions, this time about the Los Osos wastewater project update's team of experts. (while reading the link, please keep in mind that in their March 28th huge-headlined story, the Tribune apparently mistook the attached "plan" for an actual "plan" and forgot to note the date on the "plan," which was 2003. Hence the misleading headlines that surely sent everyone in Los Osos into a tizzy -- Plan? WHAT PLAN? WHAAAAA? What the Tribune burbled on about was a 2003 step/steg proposal, included in the RFP response because it's similar to the a step/steg system Ripley Pacific Co. is now working on for a similar-sized city in No. CA.